Preventive schedules per equipment
By running hours or by date
A reach stacker out of service stalls the yard, and the cost lands on operations rather than on the workshop. Maintenance plans the work that prevents that, records the work that could not be prevented, and shows what downtime is actually costing per machine.
Handling equipment is usually maintained reactively and recorded on paper, which means nobody can answer two questions that matter: which machine is costing the most, and whether a machine should be repaired again or replaced. Maintenance answers both by keeping the schedule, the job and the parts against the asset for its whole life.
By running hours or by date
By unit and by cause
So repair or replace is an informed decision
Preventive maintenance is scheduled against the asset and raised automatically when it falls due.
Schedules per equipment on running hours or on a calendar, whichever suits the asset.
What is due now and what has been allowed to slip, so planned work is not quietly skipped.
The task list that goes with each schedule, so the same service means the same work every time.
A breakdown is raised where it happens and tracked through to a closed job, not phoned through and forgotten.
Raised against the machine with the fault reported, the work carried out and who did it.
Parts consumed booked against the job and the machine, so the cost sits with the asset.
Time out of service captured against the job, with a cause, so patterns are visible.
Every job, part and hour of downtime accumulates against the asset, which is what makes the replace decision possible.
Every job on the machine, in order, retained for the life of the asset.
By unit and by cause, so the worst machine and the most common failure are both visible.
Labour and parts totalled per asset, against its availability.
Access is granted per module and per role, so two people signed into the same platform see different work.
| Role | What the role works with |
|---|---|
| Yard operator | Reporting a fault against the machine that has it |
| Workshop technician | Job cards, work carried out, parts consumed |
| Workshop supervisor | Schedules, assignment, overdue planned work |
| Engineering manager | Downtime by cause, cost per machine, replace or repair |
| Administrator | Asset register, schedule templates, role access |
Maintenance runs on the same identity service and the same equipment register as STOS core, so the reach stacker a job card is raised against is the reach stacker operations assigned to a move.
Yes. A schedule is set against the asset on either basis, because a crane that works two shifts and one that works occasionally should not be serviced on the same calendar.
Parts consumption is booked against the job and the machine in Maintenance, and the replenishment is raised through the Procurement module, so the same part has one cost and one approval trail.
It reports downtime by unit and by cause and totals labour and parts per machine. That is what makes a repair-or-replace case arguable rather than anecdotal.
Yes, like every add-on module. Terminals usually add it once the equipment fleet is large enough that reactive maintenance stops being affordable.
Ask for a walkthrough and we will show the module and map it against your own equipment list.
Bring your own customers, tariffs and volumes and we will walk the module end to end on a live system.